High Quality biogas generator 500kva-1mw biogas generator for sale price
Product Parameters
Model Number (Engine Type) |
LHBG500-1000 |
Brand Name |
LVHUAN |
Prime Power/Standby Power |
500-1000KW |
Rated Speed |
1000r/min |
Rated Frequency |
50/60Hz |
Rated Voltage |
400V/230V |
Phase |
AC 3-Phase, 4 wire |
Voltage Stability |
≤±2% |
Voltage Transient |
≤±10% |
Voltage Stable time |
≤1s |
Heat consumption |
≤11mj/kw.h |
Lubricant Consumption |
≤1.0g/kw.h |
Intake Mode |
Supercharging inter cooler |
Cylinder Number |
12 v |
Cylinder Bore |
190mm |
Stroke |
210mm |
Starting System |
DC 24V electric motor |
Cooling Method |
Circulating water cooler |
Lubricant Method |
Passive and flying lubricant |
Isolation Class |
H |
Protection |
IP23 |
Alternator |
Siemens |
Power Factor |
0.8 lagging |
Exciting Method |
Brushless |
Colour |
According to your request |
Certification |
ISO 9001:2008, CE |
Warranty |
1 year or 1000 running hours arrives first |
Type |
Open |
Control system |
Automatic alarm system |
Size |
6000x1900x2735mm |
Weight |
12000kg |
-------------------------Requirements For Biogas Genset
Within 1m from pressure regulating valve of gas intake
Δ Gas% tempertaure ≤ 40ºC
Δ Pressure 3-20kpa, rate of pressure changing ≤ 1kpa/min
Δ H2S ≤ 200mg/Nm3
Δ Nm3 ≤ 20mg/Nm3
CH4 content ≥40%, changing rate ≤ 2%/min
Δ Impurity particle size ≤ 5μm, impurity content ≤ 30mg/Nm3
Δ Moisture content ≤ 40g/Nm3
--------------------------Application Place
Δ Breeding enterprise-biogas generate power
Δ Industry-alcohol plant, starch factory anaerobic sewage treatment.
Δ Refuse landfill-sewage biogas generate power.
------------------------Our Advantages
Δ Strong structure & Strengthen accessories
Δ Easy Start & ATS system
Δ Auto voltage regulation & Stable working condition
Δ Imported and easy-operation control system
Δ Imported and accurate gas control system
Δ Standard parts for easy maintain
Δ long life operation and low-operation cost
------------------------ Company Profile
Δ Established in 2008
Δ Factory area over 40000 square meters
Δ Over 260 employees, technicians over 100 people
Δ Provide repaire service free during the guarantee period
Δ Got the CE, ISO14001, ISO9001 certification
Δ Website lvhuanpower.en.made-in-china.com
We have established so many business relationship with many friends around the world.
----------------------------FAQ
√ HOW TO CHOOSE THE RIGHT MODEL?
1. It depends on prime power, voltage,frequency and fuel type.
PLEASE TELL ME WHAT FUEL (NATURAL GAS, BIOGAS, BIOMASS GAS, WOOD SYNGAS, METHANE, COAL GAS) OR RAW MATERIAL (LIKE WOOD, GRASS, NUTSHELL ETC).
2. Our salesman and engineers are always available at your service.
√ WHAT IS THE OIL CONSUMPTION AND CAPACITY PER HOUR?
1. 1.0---1.63 g of lubricant oil consmption per hour.
1.0 cubic meter gas can produce 1.5-3.0 kw/h power.
√ WHAT THE OVERHAUL?
About 30,000 working hours. One week is enough to finish. We offer manual for weekly, monthly and overhaul maintenance.
√ WHAT IS THE WARRANTY?
One year. We offer all spare parts FREE of charge during warranty period. After this period, spare parts are not free. What's more, a set of spare parts will be shipped together with generator set free of charge.
√ HOW TO MAKE AN ORDER?
Just send inquiry / message to our sales. And we will reply and offer the details as soon as possible according to your request.
Notice About Power Plant Construction ! ! ! ! ! ! ! ! ! ! ! ! !
× Generator Room is usually constructed in open or semi-open type. The floor should be easily to clean and not easily to spark.
× If you want to construct Closed Generator Room, you must construct a single storey building. The open direction of all the doors and windows must turn outside. Please install some big capacity displacement device to avoid gas gathering.
× Generator Room and the Operation Room must be separated, can not be directly connected. The observation window should be with double deck glass protected by steel wire mesh.
× Lightning arrester is necessary.
× Prepar enough fire extinguishing appliances.
× "NO FIRE" mark should be obvious, open flame in the generator room is not allowed.
× In the exhaust gas, there are combustible gas. So, the exhaust pipe of the generator must be leaded to outside of room. The exhaust pipe must be connected tightly.
Welcome to inquiry !