Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Gas requirements of natural gas genset
Within 1m from pressure regulating valve of gas intake
Ratio of CH4 in natural gas: ≥70%
Pressure of natural gas: 80-200kPa, rate of pressure change: ≤ 1kPa/min
H2S: ≤20mg/Nm³
Impurity particle size: ≤ 5μm, impurity content: ≤30mg/Nm³
Moisture content: ≤40g/Nm³
Parameter of 50Hz 1500RPM 200Kw Natural Gas Generator
Parameter of Natural Gas Generator Set | |
Model Number (Engine Type) | LHNG1000,LHNG1200,LHNG1500,LHNG2000 |
Brand Name | LVHUAN |
Power | 1000KW,1200KW,1500KW,2000KW |
Rated Speed | 1500/1800RPM |
Rated Frequency | 50/60Hz |
Rated Voltage | 400V/230V |
Phase | AC 3-Phase, 4 wire |
Voltage Stability | ≤±2% |
Voltage transient | ≤±10% |
Voltage Stable time | ≤1s |
Heat consumption | ≤11mj/kw.h |
Lubricant consumption | ≤1.0g/kw.h |
Engine Capacity | 26.9L |
Cylinder Number | 12 |
Cylinder Bore | 138mm |
Stroke | 150mm |
Starting System | DC 24V electric motor |
Cooling method | water cooler |
Lubricant method | Passive and flying lubricant |
Isolation class | H |
Protection | IP23 |
Alternator | Siemens Liuzhou |
Power Factor | 0.8 lagging |
Exciting method | brushless |
Colour | your choice |
Certificates | ISO 9001:2008, CE |
Warranty | 1 year or 1000 running hours which arrives first |
Type | Open |
Control system | Automatic alarm system |
Size | 3250x1450x2140mm |
Weight | 3200kg |
Over 20-year gas engine technology
Overhaul term: 15000-20000 hours
Over 85% co-generation efficiency
Economical and low-cost running
Higher power output and stronger capability of load
Better combustion and lower emission
Continuous rating up to 80% of prime power rating
Exceed 10-year genset repair and maintenance experience
Larger displacement engine to keep much surplus for genset power output
ISO standard production
Long genset lifespan
Spare parts supplied lifetime
Well-known brand generator-Siemens
Monitoring, control, alarm and protecting system on PLC controllor
Parallel operation with genset or city power grid for option
Free of charge training for operation and maintenance
(1). Pre-sale service:
1) We will send our engineer to prospect the site of power station free of charge.
2) According to the situation of site, we will provide design drawings, such as power plant floor drawing, cooling system drawing, genset foundation, control room design, etc.
(2). Sale service:
1) Operator training would be conducted by Lvhuan technicians during the process of commissioning or Factory training course in China,
2) Installation and commission of the genset would be instructed assisted by Lvhuan technicians at site.
(3). After-sale service:
1) We have strong after-sale team, we will response within 24 hours and provide technical supports by phone or site guiding, help our clients to gain the biggeset profit.
2) For the quality problem, we will service for you free of charge during the guarantee period.
3) We provide one year guarantee period and lifetime service.
8. Plentiful spare part supply:
(1). We have spare parts department, plentiful spare part supply for all genset model will guarantee genset lifetime running.
(2).All parts were from original factories or professional factories,complete in specification, keep good quality.
(1). How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
(2). What's the warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
(3). How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
(4). Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
(5). What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.