Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Controlling way | Automatically |
Inspiration | biogas |
Cooling system | CHP system |
Starting system | 24VDC Electric motor |
Governoring | Electronic |
Insulation Class | H |
Voltage Stabilized regulation | ≤±1.5% |
Voltage Instantaneous regulation | ≤±20% |
Voltage Recovery time(S) | ≤1 |
Voltage Fluctuation ratio | ≤1% |
Voltage Wave aberration ratio | ≤5% |
Frequency Stabilized regulation | ≤1%(adjustable) |
Frequency Instantaneous regulation | -10%~12% |
Frequency Recovery time(S) | ≤7 |
Frequency Fluctuation ratio | ≤1% |
Generator Insulation class | H |
Noise level(dB) | ≤95 |
Engine model | GKT38 |
Type | Inline, four stroke, electronic-control spark plug ignition, water-cooling, wet cylinder jacket, premix proper ratio of air and gas before combustion |
Rated Speed | 1500RPM |
Rated Power (KW/KVA) | 530 / 660 |
Type | Inline, 6 cylinder, water cooling, natural inspiration |
Cylinder Type | Wet Type |
Number of cylinders | 12 |
Bore (mm) | 159 |
stroke (mm) | 159 |
Displacement | 37.8 |
Compression ratio | 9:1 |
Dry weight(kg) | 2000 |
Dimension (mm)(LXWXH) | 4300X1700X2360 |
RFQ:
1.How to choose the right model?
A: It depends on real output power, Voltage, Frequency and gas type.
2.What is the oil consumption and capacity per hour?
A: 1.0g of lubricant oil consumption per hour.
1.0 Cubic meter gas can produce3.5-4.0kw/h power.
The capacity depends on gas energy.
3. What is the warranty?
A: 1 year. Inside this 1 year, we offer all spare parts free of charge. After this period, spare parts are not free. But, a set of spare parts will be shipped together with machine free.
4.. How is the service?
A: We offer installation,repair and maintain service abroad. And online guide service if needed anytime. Our before-sale, in-sale and after-sale service are all trustable, you can name it.
Any questions, please contact me freely.
Notice:
Payment: TT/LC 30%+70%
Delivery date: 15-30 days
Shipment: LCL for 10-100kw
20GP for 120-200kw
40HQ FOR 250-1000KW