Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Engine | Item | Technical specifications | ||
Model | 6300D/M | 8300D/M-1 | 8300D/M-2 | |
Type | In-line, four-stroke, inter-cooling, spark plug ignition, open combustion | |||
Cylinder number | 6 | 8 | 8 | |
Cylinder diameter (mm) | 300 | |||
Rated speed (r/min) | 500 | 500 | 600 | |
Rated power (KW) | 400 | 500 | 550 | |
Heat consumption at rated power (MJ/kwh) | ≤11.0 | |||
Rotating direction (from flywheel side) | Clockwise | |||
Starting mode | Compressed air/motor start | |||
Exhaust temperature (ºC) | ≤600 | |||
Gas pressure (kPa) | ≥2.5 | |||
Gas inlet temperature (ºC) | ≤40 | |||
Oil consumption rate (g/kW.h) | ≤0.8 | |||
Generator set | Model | 350GFM | 400GFM | 500GFM |
Rated power (kw) | 350 | 400 | 500 | |
Voltage (V) | 400/6300/10500 | |||
Current (A) | 631/40/24 | 722/46/28 | 902/57/34 | |
Power factor (COSΦ) | (lagging) | |||
Excitation mode | Brushless | |||
Phase and connection | 3 phase 4 wires/3 phase 6 wires | |||
Size (L*W*H) (mm) | 5800*1600*2900 | 6400*1600*2900 | 6400*1600*2900 | |
Weight (kg) | 18000 | 22000 | 22000 |
1. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
2. What's the warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
3. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
4. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
5. What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.
Welcome to ask for question and quoation!