  • CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
  • CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
  • CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
  • CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
  • CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
  • CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
Find Similar Products

Basic Info.

Model NO.
LH500GFJ
Certification
CE, ISO
Power
>200kW
Standard
Standard
Model
500kw - 2MW Syngas Generator
Prime Power
500kw - 2MW
Fuel
Biomass Gas, Syngas, Pyrolysis Gas
Installation
on-Site Guide
Gas Mixed Mode
Inside Mixture
Controller
Comap/Deepsea
Technology Support
Lifetime
Engineer Overseas Available
Yes, Available
Optional Component
CHP/Silent Canopy
Transport Package
with Standard Package
Specification
Gas mixing type: outside
Trademark
LVHUAN
Origin
Shandong, China
HS Code
8502200000
Production Capacity
30 Sets/Month

Product Description

Waste to electricity pyrolysis gas 500kw - 2mw syngas generator
CE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas GeneratorCE/Isoelectricity Pyrolysis Gas 500kw - 2MW Syngas Generator
1. Waste to electricity pyrolysis gas 500kw - 2mw syngas generator core features:
1) Low cost in maintenance
2) Large cylinder , Long Stroke, Low Speed, which means big reserve power capacity and constant power output
3) Low Engine Speed at 500 or 600RPM
4) Naturally Aspirated, which means low failure rate and minimaldowntime
5) Internal MixingSystem (for high hydrogengas)
6) Strong Treatment and Resistance AbilityAgainst TAR
7) Long Overhaul Time of 60000hours and lifecycle of 20-25 years
8) CE and ISO approved
 
2. Main technical parameters for waste to electricity pyrolysis gas 500kw - 2mw syngas generator:
Engine Item Technical specifications
Model 6300D/M 8300D/M-1 8300D/M-2
Type In-line, four-stroke, inter-cooling, spark plug ignition, open combustion
Cylinder number 6 8 8
Cylinder diameter (mm)    300
Rated speed (r/min) 500 500 600
Rated power (KW) 400 500 550
Heat consumption at rated power (MJ/kwh) ≤11.0
Rotating direction (from flywheel side) Clockwise
Starting mode Compressed air/motor start
Exhaust temperature (ºC) ≤600
Gas pressure (kPa) ≥2.5
Gas inlet temperature (ºC) ≤40
Oil consumption rate (g/kW.h) ≤0.8
Generator set Model 350GFM 400GFM 500GFM
Rated power (kw) 350 400 500
Voltage (V) 400/6300/10500
Current (A) 631/40/24 722/46/28 902/57/34
Power factor (COSΦ) (lagging)
Excitation mode Brushless
Phase and connection  3 phase 4 wires/3 phase 6 wires
Size (L*W*H) (mm) 5800*1600*2900 6400*1600*2900 6400*1600*2900
Weight (kg) 18000 22000 22000

3. Environment requirements for waste to electricity pyrolysis gas 500kw - 2mw syngas generator:
1) Ambient temperature between -20°C~+40°C;
2) Relative humidity less than 90%(20ºC);
3) Site elevation not higher than 2500m;
4) For outdoor installation, simple rain shelter is required. 

4. Waste to electricity pyrolysis gas 500kw - 2mw syngas generator quality requirements:
1) Gas temperature≤40°C
2) Gas pressure 2.5~10kpa, Pressure change rate≤1kPa/min
3) Tar content≤20mg/Nm3
4) H2S content≤50mg/Nm3
5) Impurities particle size≤5μm, Impurity content≤30mg/Nm3
6) Moisture content≤20 mg/Nm3
7) Heat value≥4MJ/Nm3.

5. Waste to electricity pyrolysis gas 500kw - 2mw syngas generator price photos:

6. Spare parts of gas generator:

7. Waste to electricity pyrolysis gas 500kw - 2mw syngas generator power plant:

8. FAQ:  
1. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
2. What's the warranty of gas generator?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
3. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
4. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
5. What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.

Welcome to ask for question and quoation!

 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier