500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator

Product Details
Customization: Available
After-sales Service: One Year
Warranty: 12 Months

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
81
Year of Establishment
2008-10-13
  • 500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
  • 500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
  • 500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
  • 500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
  • 500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
  • 500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
Find Similar Products
  • Overview
  • Product Description
  • Generator Set Features:
  • Product Parameters
  • Worksite requirements
  • Service committee:
  • FAQ
Overview

Basic Info.

Model NO.
LHNG500
Output Type
AC Three Phase
Gas Source
Natural Gas
Certification
CE, ISO, Patents
Power
>200kW
Standard
Standard
Rated Power
500kw
Rated Voltage
400V/220V
Rated Speed
1000rpm
Rated Frequency
50Hz/60Hz
Gas Mixed Mode
Outside
Alternator
Siemens, Standford, Leroy Somer, Marathon, etc.
Cooling Method
Circlulating Water Cooling
Heat Consumption
Less Than 9.8mj/Kw.H
Overheal Time
More Than 30000h
Prime Power
400kw
Transport Package
Exporting Standard Packing
Specification
LHNG500
Trademark
LVHUAN
Origin
Shandong, China(Mainland)
HS Code
8502200090
Production Capacity
100/Month

Product Description

Product Description

CE approved Natural Gas Generator Set

1. +20 years professional manufacturer.
2. Wide power range: 10kw-5000kw gas generator, single or parallel running.
3. Multi-option of engine, alternator, control system and cooling system, PLC control panel.
4. Long continuous running hours, 8000 hours per year.
5. CE & ISO approved
6. OEM provided
7. Holding many patents
8. Perfect service system(Sales, Installation, Debugging and after-sale service)
 9. Full Range: our products mainly include natural gas generator, biogas generator, biomass generator, coal gas generator, syngas generator, coal-bed gas generator, coke oven gas generator, diesel generator etc. 
Generator Set Features:

Main spare parts:

1.Control system: America Woodward control system
2. Controller: ComAp, Deepsea, Woodward
3. Ignition system: American ALTRONIC, including:magneto, high-tension coil
4. Starting system: DC 24V electric motor. 
5. Mixer: IMPCO
6. Spark plug: STITT 
 
Product Parameters
 
Model Number  LHNG
Brand Name LVHUAN
Prime Power 8-480KW
Rated Power 10-600KW
Gas Mixed Mode Outside
Rated Speed 1500rpm/1000rpm
Rated Frequency 50/60Hz 
Rated Voltage 400V/230V 
Rated Current 18-1080A
Phase AC 3-Phase, 4 Wire
Gas Pressure 80-200kpa
Intake Mode Natural Intake/Supercharging and Inter Cooler
Voltage Stability ≤±2%
Voltage Transient ≤±10%
Voltage Stable Time ≤1s
Heat Consumption ≤9.8mj/kw.h
Lubricant Consumption 1-1.3g/kw.h
Noise 75-105dB(A)
Cylinder Number 4/6/12
Cylinder Bore 100/105/135/138/190mm
Starting System DC 24V Electric Motor
Sparking Mode Spark Plug
Cooling Method Circlulating Water Cooling
Lubricant Method Passive and Flying Lubricant
Isolation Class H
Protection IP23
Alternator Siemens, Standford, Leroy Somer, Marathon, etc.
Power Factor 0.8 Lagging 
Exciting Method Brushless 
Colour You Decide 
Certificates ISO 9001:2008, CE
Warranty 1 Year
Overheal Time More Than 30000h
Type Open 
Control System Automatic Alarm System 
Size 1450*700*1100mm~6000*1970*2735mm
Weight 600kg~12000kg

500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator

Worksite requirements

The worksite needs to meet following basic requirements:
 a)  Ambient temperature between -40ºC~40ºC;
 b)  Relative humidity less than 95%(35ºC);
 c)  Site elevation not higher than 3500m;
 d)  For outdoor installation, simple rain shelter is required.
 
Requirements for Biogas
Within 1m from pressure regulation valve of gas intake
1. Gas Temperature≤40ºC 
2. Pressure 80~200kpa, Changing Rate≤1kpa/min
3. H2S≤20mg/Nm³
4. Content of CH4≥70%
5. Impurity Particle Size≤5μm, impurity content≤30mg/Nm³
6. Moisture Content≤40g/Nm³

Some Tips
Higher content of sulfur and ammonia is not only seriously corrodes the spark plug, but also increase the lubricant's acid value, and then gen-set internal parts will be corroded partly. That will shorten the gen-set's life time. So the gas scrubbing is very important!
Technical ParametersApplied Range
1. Oil Field
2. Industrial Zone
3. Petroleum Chemical
4. Using Natural Gas Generator Set as Standby Power Source
5. Supplying Power for Auxiliary Engine which work in Oil Well.
500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
Service committee:

1. Pre-sale service: 

1) We will send our engineer to prospect the site of power station free of charge.
2) According to the situation of site, we will provide design drawings, such as power plant floor drawing, cooling system drawing, genset foundation, control room design, etc.
 
2. Sale service:
1) Operator training would be conducted by Lvhuan technicians during the process of commissioning or Factory training course in China,
2) Installation and commission of the genset would be instructed assisted by Lvhuan technicians at site.
 
3. After-sale service:
1) We have strong after-sale team, we will response within 24 hours and provide technical supports by phone or site guiding, help our clients to gain the biggeset profit.
2) For the quality problem, we will service for you free of charge during the guarantee period.
3) We  provide one year guarantee period and lifetime service.
 
Plentiful spare part supply:
1. We have spart parts department, plentiful spare part supply for all genset model will guarantee genset lifetime running.
2.All parts were from original factories or professional factories,complete in specification, keep good quality.
500kw to 2MW Power Plant Natural Gas LPG Generator/Electricity Generator
FAQ

1. Are you factory? and where is your factory?
Yes, we are. Our factory is located in Zhangqiu Longshan subdistrict, Jinan city, Shandong province, Welcome to visit our factory.

2. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
 
3. What's the genset warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
 
4. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
 
5. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
 
6. What's about the installation and commissioning?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.

7. What is your regular delivery time?
20 days after order releasing.

Please feel free to contact Sarah for any question.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier