300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set

Product Details
Customization: Available
After-sales Service: One Year
Warranty: 12 Months

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
81
Year of Establishment
2008-10-13
  • 300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
  • 300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
  • 300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
  • 300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
  • 300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
  • 300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
LHBMG500
Output Type
AC Three Phase
Gas Source
Biomass Gas
Certification
CE, ISO
Power
300kw - 2MW
Standard
Standard
Name
Combine Heat and Power CHP Wood Gas / Pyrolysis Ga
Fuel
Biomass Gas, Syngas, Wood Gas, Pyrolysis Gas
Alternator
Siemens: Brushless, Self-Excited, with AVR, Insula
Controller
Comap, Deepsea
Ignition System
Altronic
Lube Oil
Total Gas Engine Oil 15W-40
Intake Mode
Natural Aspired
Cooling Mode
Closed or Open Type Water Cooling
Lubrication Mode
Pressure and Splash
Color
Yellow or Custom Colors
Speed
500/600rpm
Transport Package
Membrane or Plywood
Specification
300kw - 2mw
Trademark
LVHUAN
Origin
Jinan, Shandong
HS Code
8502200090
Production Capacity
50 Sets Per Month

Product Description

Combine Heat and Power chp Wood Gas / Pyrolysis Gas generator 300kw - 2mw
300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
1. Combine Heat and Power chp Wood Gas / Pyrolysis Gas generator 300kw - 2mws
1) Low cost in maintenance
2) Large cylinder , Long Stroke, Low Speed, which means big reserve power capacity and constant power output
3) Low Engine Speed at 500 or 600RPM
4) Naturally Aspirated, which means low failure rate and minimaldowntime
5) Internal MixingSystem (for high hydrogengas)
6) Strong Treatment and Resistance AbilityAgainst TAR
7) Long Overhaul Time of 60000hours and lifecycle of 20-25 years
8) CE and ISO approved
 
2. Main technical parameters for Combine Heat and Power chp Wood Gas / Pyrolysis Gas generator 300kw - 2mw:
Syngas
Engine
Item Technical specifications
Model 6300D/M 8300D/M-1 8300D/M-2
Type In-line, four-stroke, inter-cooling, spark plug ignition, open combustion
Cylinder number 6 8 8
Cylinder diameter (mm)    300
Rated speed (r/min) 500 500 600
Rated power (KW) 400 500 550
Heat consumption at rated power (MJ/kwh) ≤11.0
Rotating direction (from flywheel side) Clockwise
Starting mode Compressed air/motor start
Exhaust temperature (ºC) ≤600
Gas pressure (kPa) ≥2.5
Gas inlet temperature (ºC) ≤40
Oil consumption rate (g/kW.h) ≤0.8
Syngas
Generator set
Model 350GFM 400GFM 500GFM
Rated power (kw) 350 400 500
Voltage (V) 400/6300/10500
Current (A) 631/40/24 722/46/28 902/57/34
Power factor (COSΦ) (lagging)
Excitation mode Brushless
Phase and connection  3 phase 4 wires/3 phase 6 wires
Size (L*W*H) (mm) 5800*1600*2900 6400*1600*2900 6400*1600*2900
Weight (kg) 18000 22000 22000
300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
3. Environment requirements for Combine Heat and Power chp Wood Gas / Pyrolysis Gas generator 300kw - 2mw:
1) Ambient temperature between -20°C~+40°C;
2) Relative humidity less than 90%(20ºC);
3) Site elevation not higher than 2500m;
4) For outdoor installation, simple rain shelter is required. 

4. Combine Heat and Power chp Wood Gas / Pyrolysis Gas generator 300kw - 2mw gas quality requirements
1) Gas temperature≤40°C
2) Gas pressure 2.5~10kpa, Pressure change rate≤1kPa/min
3) Tar content≤20mg/Nm3
4) H2S content≤50mg/Nm3
5) Impurities particle size≤5μm, Impurity content≤30mg/Nm3
6) Moisture content≤20 mg/Nm3
7) Heat value≥4MJ/Nm3.
300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set300kw - 2MW Combine Heat and Power CHP Wood Gas / Pyrolysis Gas Generator Set
FAQ

1. How to choose the right model?
To choose a right model, we need to know required continuous output power, local voltage and frequency and fuel (such as diesel, natural gas, biogas, biomass gas, coal gas, syngas, etc.). For biomass power plant and coal gas power plant, some clients may doesn't have gasification system, then we need information about raw material.
2. What's the warranty?
The warranty is one year. We will offer free service and spare parts during warranty period. Lifetime service will be provided by our trustworthy after-sale team.
3. How to do the maintenance?
Operator training will be provided by our technician. After training, local operator can do the basic maintenance by themselves according to our maintenance manual.
4. Will be operation training offered?
Yes, operator training would be conducted by our technicians during the process of commissioning or factory training course in China.
5. What's about the installation and commissioning of syngas/biomass/pyrolysis/wood gas generator?
Installation and commissioning of the genset would be instructed assisted by our technicians on site.

Welcome to ask for question and quoation!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier